Couto Homes Floorplans

Pricing includes:

  • Site Location Items Included:
  • $3,000 in Site Dirtwork
  • If County ($5,500 in Septic System & $1,500 in Water Tap)
  • If City ($7,000 towards Permits, Sewer Tap, & Water Tap)
  • $3,000 in Final Grading
  • $10,000 in Landscaping Package. 10,000 sq ft of Sprinkler & Sod, Flower bed package at front of home
  • 2500 sq ft of Driveway
  • Culvert at Bar Ditch

 

  • Structural Engineering Included:
  • Soil Boring to 20′ Below surface
  • Geological Technical Lab Report  OR  Max Design
  • Engineered Foundation Design ( Based on Lab report or Max Design )
  • * Rebar or Post-Tension design with 10 Year Structural Warranty
  • Engineered Framing Structure
  • Pump Truck if needed

Pricing includes ( Continued ):

  •  EPA & Code Compliance Included:
  • Energy Report, Design & Implementation
  • Wind Bracing Report, Design & Implementation
  • Heat Load Report, Design & Implementation
  • Health Department Permits

 

  • All Necessary Insurance Included:
  • General Liability Insurance Coverage
  • Builder’s Risk Insurance Coverage
  • Worker’s Compensation Coverage

 

  • Miscellaneous Items Included:
  • Customization & Completed set of Blueprints included**
  • **40 to 80 hours of drafting time included based on size of home
  • Customized Specifications by Home Specialists with a minimum of 100 Homes Completed
  • Selections guided by Certified Selection Coordinators ( Or within 6 months of Certification )
  • Site Supervision by Qualified Superintendents with a minimum of 100 Homes Completed