Site Location Items
- Allowance in site dirt work – Series specific
(Excluding SouthBend Estates, as lots are pre-benched) - If county, allowance towards septic system and water tap
- If city, allowance towards permits, sewer tap, & water tap
- Allowance towards final grading – Series specific
- Allowance for sprinkler & sod, flower bed package at front of home – Series specific
- Allowance for specific square footage of driveway – Series specific
- Culvert at bar ditch
Epa & Code Compliance
- Energy report, design & implementation (in city)
- Wind bracing report, design & implementation (in city)
- Heat load report, design & implementation (in city)
- Health department permits (in city)
Structural Engineering
- Geological technical lab report OR max design
- Engineered foundation design (based on lab report or max design)
- Rebar or post-tension design with 10 year structural warranty
- Pump truck if needed
Necessary Insurance
- General liability insurance coverage
- Builder’s risk insurance coverage
- Worker’s compensation coverage
Miscellaneous Items
- Customization & completed set of blueprints
- Up to 20 hours of drafting time (Classic Series)
- Up to 40 hours of drafting time (Signature Series)
- Up to 60 hours of drafting time (Executive Series)
- Up to 80 hours of drafting time (Luxury Series)
- Customized specifications by Home Specialists
- Selections guided by certified selection coordinators (or within 6 months of certification)
- Site supervision by qualified Project Managers
- Stamped foundation engineering design
- All necessary permit gathering